The metro

Data on the Bucharest metro network, its development and its extension projects, together with the corresponding documentary sources.

Underground · Bucharest

Five lines, 64 stations and a sixth line to the airport under construction

  • 64stations in service
  • ~80km of network
  • 153 mil.passengers carried in 2025
  • 1979first passenger train
  1. M1
    Dristor 2Dristor 2Piața MunciiIanculuiOborȘtefan cel MarePiața Victoriei 1Gara de Nord 1Basarab 1CrângașiPetrache PoenaruGrozăveștiEroilorIzvorPiața Unirii 1Timpuri NoiMihai BravuDristor 1Nicolae Grigorescu 1TitanCostin GeorgianRepublicaPantelimonPantelimon
    Since 1979 · 22 stations · 31 km
  2. M2
    PiperaPiperaAurel VlaicuAviatorilorPiața Victoriei 2Piața RomanăUniversitatePiața Unirii 2TineretuluiEroii RevoluțieiConstantin BrâncoveanuPiața SuduluiApărătorii PatrieiDimitrie LeonidaBerceniTudor ArgheziTudor Arghezi
    Since 1986 · 15 stations · 20 km · extended to Tudor Arghezi in 2023
  3. M3
    PrecizieiPrecizieiPăciiGorjuluiLujeruluiPolitehnicaEroilorIzvorPiața Unirii 1Timpuri NoiMihai BravuDristor 1Nicolae Grigorescu 21 Decembrie 1918Nicolae TecluAnghel SalignyAnghel Saligny
    Since 1983 · 15 stations · 22 km, partly shared with M1
  4. M4
    Gara de NordGara de Nord 2Basarab 2Grivița1 MaiJiuluiParc BazilescuLaminoruluiStrăuleștiStrăulești
    Since 2000 · 8 stations · 7.4 km · 14 more stations planned to Gara Progresul
  5. M5
    Râul DoamneiRâul DoamneiConstantin BrâncușiValea Ialomiței (branch)RomancierilorParc Drumul TabereiTudor VladimirescuFavoritOrizontAcademia MilitarăEroilor 2Eroilor
    Since 2020 · 10 stations · 7 km, with the branch to Valea Ialomiței
  6. M6
    1 Mai1 MaiPajuraExpozițieiPiața MontrealGara BăneasaAeroport BăneasaTokyoWashingtonParisBruxellesOtopeniIon I.C. BrătianuAeroport Henri CoandăAeroport Henri Coandă
    Under construction since Dec. 2023 · 12 stations · 14.2 km · works forecast to end in Nov. 2028
Did you know?
  • Photo: Neoclassicism Enthusiast, CC BY-SA 4.0

    The station trains ran through for almost a year without stopping

    According to architect Sorin Călinescu, one of the station's designers, quoted by Historia magazine, Elena Ceaușescu demanded in 1985 that the station be removed from the M2 plans, yet the basic works were carried out regardless. Trains ran through the station without stopping for almost a year, until it opened on 28 November 1988. Its platforms are less than 1.5 metres wide, a consequence of its late inclusion in the project.34

  • Photo: Nicubunu, CC BY-SA 4.0

    Romania's first metro trains were built in Arad

    The first trains, the Astra IVA, were designed in Romania and built in Arad: 504 cars delivered between 1978 and 1989. A few sets still run today, alongside Bombardier Movia, CAF and Alstom trains.2

  • Photo: Chainwit., CC BY 4.0

    Gara de Nord actually has two stations

    Gara de Nord 1 (M1 and M3) and Gara de Nord 2 (M4) are distinct stations. Transferring between the lines they serve requires leaving the system and validating the ticket again.5

  • Photo: TrainSimFan, CC BY-SA 4.0

    The shortest hop: 430 metres

    Gara de Nord 2 and Basarab 2, on M4, are only 430 metres apart, the shortest distance between two stations on the network.5

  • Photo: kallerna, CC BY-SA 4.0

    Piața Victoriei is one station, though the map shows two

    Victoriei 1 and Victoriei 2 are one station with platforms on different levels. M1 was also meant to have Dorobanți and Giulești stations, which were never built.5

  • Photo: Rc1959, CC BY-SA 4.0

    Five days without trains at Piața Unirii

    In 1987 Piața Unirii station flooded and trains were halted for five days.5

  • Photo: FrancisTyers, CC BY-SA 3.0

    The stations were also designed as shelters

    The stations were designed to double as air-raid shelters. Some have sealed metal doors that have never been used.2

  • Gorjului, a station with two faces

    Gorjului station was built in two stages, in 1994 and 1998, so its two platforms have different materials and colours.5

  • Six stations were renamed in 2009

    Semănătoarea became Petrache Poenaru, Armata Poporului became Lujerului, Industriilor became Preciziei, Policolor became Nicolae Teclu, Linia de Centură became Anghel Saligny and IMGB became Dimitrie Leonida.2

  • The airport metro costs over 10 billion lei

    M6 links 1 Mai to Henri Coandă Airport through 12 stations over 14.2 km. Works began on 15 December 2023, the updated cost exceeds 10.45 billion lei including VAT, and funding comes from Romania's recovery plan, EU funds, a Japanese loan (JICA) and the state budget.6

Metro news

Sources

The documents, articles and databases consulted for this page. Links open in a new page. Network figures and passenger numbers: sources 1, 2.

  1. Transportul de pasageri cu mijloace de transport public local, pe tipuri de mijloace (GOS114B), Institutul Național de Statistică, TEMPO-Online
  2. Metroul din București, Wikipedia
  3. Stația Piața Romană, construită în secret de frica Elenei Ceaușescu, Historia
  4. Piața Romană metro station, Wikipedia
  5. Bucharest Metro, en.wikipedia.org
  6. metroul-spre-aeroportul-otopeni-intarzie-soferii-vor-circula-cu-restrictii-inca-cel-putin-doi-ani-pe-dn1-si-in-nordul-capitalei, capital.ro